OPERATING, SERVICE, ANDMAINTENANCE MANUALMODEL RPH-35,000 INDUSTRIALPLANETARY WINCHCAUTION: READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION ANDOPE
6. Remove output coupling (item #8) and coupling shaft (item #6) from end bearing (item #10). Examine bear-ings (item #14), pressed in output couplin
8. NOTE: DETERMINE MOUNTING CONFIGURATION OF WINCH (R.H. or L.H. MOUNTED) BEFORE ATTACHINGUPRIGHT FRAME TO WINCH, TO ASSURE PARTS ARE MOUNTED TO PROPE
10. Apply RTV sealing compound to ring gear mounting surface of end bearing (item #10). Place ring gear onto endbearing, aligning holes in ring gear
12. Align keyway of coupling (item #7) with key and end of input shaft sticking out of the end bearing. Slide cou-pling over end of shaft. Place ga
14. Apply Permatex to threads of plug (item #42). Thread plug into tapped hole in bottom of gear housing end bear-ing (item #10). Pour approx. 2.50
CHANNELSIDECHANNELSIDEANGLE SIDEANGLE SIDE13
NOTES
15DIMENSIONS SHOWN ARE INCHES OVER MILLIMETERS8.53216,742.251073,1.287,114.88378,0FLANGE6.00152,4BARREL13.33338,66.67169,32.5063,518.06458,72.5063,5DR
3143733b4733c33a33e33d33e20204733133434423372232292619162740416368251417453046381525103514442141112939228242118LONGEST SPLINESRPH-35,000 WINCH16
RPH-35,000 WINCH PARTS LISTItem No.Qty.Parts No.DescriptionItem No.Qty. Parts No. Description1 1 234167 DRUM ASSEMBLY 27 1 418433 LOCKNUT - 5/16-24NF
TABLE OF CONTENTSINTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1WA
OM-914109-0707-J
RAMSEY HYDRAULIC PLANETARY WINCH MODEL RPH 35,000PLEASE READ THIS MANUAL CAREFULLYThis manual contains useful ideas in obtaining the most efficient op
WINCH FRAME MOUNTINGUse (8) 5/8 inch diameter grade 5 or better bolts to attach mounting frame to wrecker.CABLE INSTALLATION1. Unwind cable by rolling
TYPICAL LAYOUT:CLUTCH OPERATIONTo engage clutch: 1. Move the clutch control valve to the "clutch-engaged" position. 2. Anytime the tempera
MAINTENANCEAdhering to the following maintenance schedule will keep your winch in top condition and performing as it shouldwith a minimum of repair.A.
INSTRUCTIONS FOR OVERHAUL1. Drain oil from gear housing (item #10) by removing plug (item #42) from end bearing. Remove reducer andrelief fitting (i
3. Remove brake assembly screws (item #16) from brake (item #33a) to access (2) mounting screws (item #20)attaching brake adapter plate (item #33d) to
5. Pull drum assembly (item #1) upward from end bearing (item #10). Remove quad-rings (item #40 & #41)from grooves in drum bushings. Remove inpu
Comments to this Manuals